Annex 1 identifies material transfer as one of the most critical risk points in aseptic processing. Every make-and-break connection creates a critical vulnerability – the ring of concern.
To manage that risk, pharmaceutical manufacturers have traditionally relied on layers of infrastructure around the transfer connection: high-grade cleanrooms, transfer isolators, laminar airflow systems and complex decontamination protocols.